Debra Baio

Review the First Draft Reports to submit public comments on documents in the Fall 2013 revision cycle

Blog Post created by Debra Baio Employee on Sep 14, 2012

The First Draft Reports for 16 NFPA documents in the Fall 2013 revision cycle are now available.  Review the First Draft Reports for use as background in the submission of public comments. The deadline to submit a public comment on any of these documents is November 16, 2012. The list of NFPA documents in the 2013 fall revision cycle is as follows:

  • NFPA 37, Standard for the Installation and Use of Stationary Combustion Engines and Gas Turbines
  • NFPA 69, Standard on Explosion Prevention Systems
  • NFPA 82, Standard on Incinerators and Waste and Linen Handling Systems and Equipment
  • NFPA 730, Guide for Premises Security
  • NFPA 731, Standard for the Installation of Electronic Premises Security Systems
  • NFPA 750, Standard on Water Mist Fire Protection Systems
  • NFPA 921, Guide for Fire and Explosion Investigations
  • NFPA 1005, Standard for Professional Qualifications for Marine Fire Fighting for Land-Based Fire Fighters
  • NFPA 1192, Standard on Recreational Vehicles
  • NFPA 1194, Standard for Recreational Vehicle Parks and Campgrounds
  • NFPA 1521, Standard for Fire Department Safety Officer
  • NFPA 1561, Standard on Emergency Services Incident Management System
  • NFPA 1670, Standard on Operations and Training for Technical Search and Rescue Incidents
  • NFPA 1963, Standard for Fire Hose Connections
  • NFPA 1965, Standard for Fire Hose Appliances
  • NFPA 1975, Standard on Station/Work Uniforms for Emergency Services

The First Draft Report serves as documentation of the Input Stage and is published for public review and comment. The First Draft Report contains a compilation of the First Draft of the NFPA Standard, First Revisions, Public Input, Committee Input, Committee Statements, and Ballot Results and Statements. Where applicable, the First Draft Report also contains First Correlating Revisions, Correlating Notes, and Correlating Input. The Report also contains a list of Technical Committee and Correlating Committee Members and instructions on how to use the First Draft Report in submitting public comments.

Outcomes