Debra Baio

Review the First Draft Reports to submit comments on documents in the Fall 2017 revision cycle

Blog Post created by Debra Baio Employee on Sep 6, 2016

The First Draft Reports for NFPA documents in the Fall 2017 revision cycle are now available.  Review the First Draft Reports for use as background in the submission of public comments. The deadline to submit a public comment through the online system on any of these documents is November 17, 2016. Some of the proposed NFPA documents with First Draft Reports in the Fall 2017 revision cycle are as follows:

 

  • NFPA 12, Standard on Carbon Dioxide Extinguishing Systems
  • NFPA 33, Standard for Spray Application Using Flammable or Combustible Materials
  • NFPA 79, Electrical Standard for Industrial Machinery
  • NFPA 92, Standard for Smoke Control Systems
  • NFPA 140, Standard on Motion Picture and Television Production Studio Soundstages, Approved Production Facilities, and Production Locations
  • NFPA 170, Standard for Fire Safety and Emergency Symbols
  • NFPA 241, Standard for Safeguarding Construction, Alteration, and Demolition Operations
  • NFPA 259, Standard Test Method for Potential Heat of Building Materials
  • NFPA 495, Explosive Materials Code
  • NFPA 1001, Standard for Fire Fighter Professional Qualifications
  • NFPA 1404, Standard for Fire Service Respiratory Protection Training
  • NFPA 1855, Standard for Selection, Care, and Maintenance of Protective Ensembles for Technical Rescue Incidents
  • NFPA 1981, Standard on Open-Circuit Self-Contained Breathing Apparatus (SCBA) for Emergency Services
  • NFPA 2001, Standard on Clean Agent Fire Extinguishing Systems

See the full list of documents in the Fall 2017 revision cycle.

 

The First Draft Report serves as documentation of the Input Stage and is published for public review and comment. The First Draft Report contains a compilation of the First Draft of the NFPA Standard, First Revisions, Public Input, Committee Input, Committee Statements, and Ballot Results and Statements. Where applicable, the First Draft Report also contains First Correlating Revisions, Correlating Notes, and Correlating Input.

Outcomes