Future updates for service connections

Idea created by pacesetter on Jul 26, 2019
    Active
    Score5
    • pacesetter

    How would one provide power to a new metering equipment, which is connected to a service ahead of main disconnect?

    The equipment is connected through transducers, and requires a very low powered (say, less than 20A) voltage source for powering the equipment. Which articles of NEC provide guidelines? Thanks