8/03/17: What term is defined in the NEC as:

Poll created by dvigstol Employee on Aug 3, 2017

Localization of an overcurrent condition to restrict outages to the circuit or equipment affected, accomplished by the selection and installation of overcurrent protective devices and their ratings or settings for the full range of available overcurrents, from overload to the maximum available fault current, and for the full range of overcurrent protective device opening times associated with those overcurrents.

12 total votes
  • Intelligent design
    0
  • Overcurrent protection
    2
  • Coordination (selective)
    9
    Your vote
  • Overcurrent risk analysis
    1