I need an NFPA 70, 2014 interpretation

Question asked by mhitchcock on Feb 22, 2017
Latest reply on Mar 1, 2017 by brian.baughman

If I am designing an RV campground service from a mutimeter center fed from utility, do I need a ground rod at each RV pedestal, or can I provide ground rods at the meter center and run a ground wire from the meter center through each RV pedestal as my "grounding electrode". Typically I will have four or five pedestals on a single 225A circuit with a 225A breaker at the meter center

consulting engineer