AnsweredAssumed Answered

comercial kitchen

Question asked by Fernando Martins on Apr 27, 2017

I'm installing a comercial kitchen hood on a 2 storey house the wall on back on equipment is concrete foundation 2x4 studs( lumber) drywall and ceramic tile 1 hour fire rated  . on celling is wood joist floor covered with type c drywall and 1/2" cement board on bottom and above sub floor plywood and ceramic

what is need to get zero clearance

Outcomes