AnsweredAssumed Answered

Hydrostatic Test when Replacing Heads

Question asked by rceppi on Mar 22, 2018
Latest reply on Mar 22, 2018 by cdafd

If sprinkler heads are replaced due to age and a 200 psi hydrostatic test was performed on the system a month earlier, is it required per NFPA 13 to perform another hydro after replacing the sprinkler heads?  There is 100 psi static pressure on the wet system.  Is an in-service test sufficient to test for leaks?

Outcomes