AnsweredAssumed Answered

Separating construction types in NFPA 5000

Question asked by jamesfinney on Sep 11, 2018
Latest reply on Sep 13, 2018 by jamesfinney

NFPA 101 allows structures with different construction types to be considered separate buildings if separated with a 2-hour rated fire barrier wall (8.2.1.3). Is there an equivalent provision in NFPA 5000, or must buildings be separated with a fire wall under NFPA 5000?

Outcomes