AnsweredAssumed Answered

Photovoltaic roof access pathways

Question asked by jmb on Oct 24, 2019
Latest reply on Nov 1, 2019 by milt.werner

NFPA 1, Sec. 11.12.2.2.2.2, a minimum 36" pathway shall be provided on either side of a horizontal ridge. 

 

Is the intent of "either side" for the pathway to be located on both sides of a ridge or on one side if the the PV panels are located up to the ridge on the other side? 

Outcomes