AnsweredAssumed Answered

Pathway Survivability Level 1

Question asked by chiefns830 on Apr 23, 2020

Assume a cable in conduit.  If I route part of the run of the conduit above the ceiling (an area that is NOT sprinkled), did I just go from Level 1 to Level 0?  I'm not a fire guy, so that is why I'm asking.

Outcomes