A collage campus emergency (NEC 700) & Legally Required Standby Systems (NEC 701) and optional systems. To do everything on campus. 

They are asking for is to install one 700 KW natural gas generator that does not have 2 hours of full demand storage on site 700.12 (B) (2) There is an excepting for approval from AHJ if it meets certain condition of reliably. Some are stated in NEC Annex F, for COPS.

 

When should this exception be applied? 700.12 (B)(3)

There are other NFPA requirement's beyond NFPA 70 correct?

 

 

 