EPS load test.

Question asked by shagunaa on Jul 30, 2020
Latest reply on Aug 6, 2020 by gary.l.olson

I have a question about running the monthly load test for an EPS.

I work for a hospital and I am running the load tests for our 800 KW generators.

According to the compliance guy, the load must be over 30% of the nameplate rating, for each phase individually, and no matter how much I tried to make him understand he is wrong, he keeps insisting he is right, and since there is no way to have a load on each phase 30% of the nameplate (meaning more than 90% total on a normal load test, without external load), according to him, our generators do not pass the tests.

How can I prove him wrong ?